Iberia Parish President M. Larry Richard announces the start up of construction on the Mullins Road Bridge over Tete Bayou.

Construction is set to begin 01/08/2024 and should last no longer than 45 days, weather permitting.

A temporary bridge structure will be in place to support local traffic during construction.

Iberia Parish Government apologizes for any inconvenience this may cause.

The public’s cooperation is greatly appreciated.

For more information contact: Iberia Parish Public Works Department at (337) 364-8474

Current Job Listings

Recent News